U.S. Navy P-8A aircraft to receive the first operational pilot production machine (Figure)
Date:2011-08-29Author:adminCategory:International militaryComment:0
Data for: new P-8A U.S. patrol aircraft
According to the China National Defense Science and Technology Information Network reported that, according to the United States,” U.S. Naval Aviation Systems Command, “site June 27, 2011 reported that the Navy’s first P -8A “Poseidon” production typical operational test aircraft on June 24 from Boeing’s Seattle test bases. The other three will be added to the research and development test aircraft, the latter has reached the Naval Aviation System (NAS) Patuxent (Patuxent) River.
new P-8A has reached the Naval Aviation System (NAS) Patuxent River, and research added to the three test aircraft, these aircraft being integrated test so as to P-8A “Poseidon” initial operational test and evaluation in preparation.
Navy in January 2011 into the low-rate initial production phase, the first production of six “Poseidon.” These aircraft will be used to combat the formation of P-8A squadron, in 2013 with its initial operational capability. (China Aviation Industry Development Research Center Wang Chuansheng)
. OtherContent_01 p {line-height: 23px; margin: 0px;} (edit: SN015)
No comment yet!