Experts in Pakistan to build our production line process open Xiaolong
Date:2011-08-30Author:adminCategory:China militaryComment:0
Hao small place for the Pakistani people to explain the manufacturing process requires
newspaper correspondent Zhang Xiaohong
in this year’s Zhuhai Air Show in November, the Pakistan Air Force pilots of the “Fierce Dragon” aircraft have a go , its superb performance left a deep impression on people. These “Fierce Dragon” aircraft that fly into Central Air Industrial reconstruction of the “Fierce Dragon” Pakistan’s production line produced the first batch of aircraft, but also the “Fierce Dragon” mode of operation of the aircraft market success story.
“Fierce Dragon” behind the success of a number of the aircraft industry to build lines to go to Pakistan expert. Hao small place, the aircraft industry to fly Assistant Chief Engineer, “Fierce Dragon” line of team leader in Pakistan to build, in October 2010 was granted in the aviation industry, “an international open up outstanding individuals,” the honorary title.
beautiful and fertile land of abundance Wen Jiangping former foster a childhood dream of youth Junjie air carries. Just out of school in 1982, the door, put it into the air Hao small manufacturing enterprises, to become a member of the aircraft assembly process. Nearly 30 years later, Hao small place has been rooted in aviation the first line of production and foreign trade projects. As a member of the aircraft assembly process, he mastered the hot and cold process manufacturing technology; as the Boeing subcontract program manager, deputy director of eight years, he assiduously, to learn and master the most advanced civil aircraft subcontracting process. Dallas Independent Guarantees and Ren Chengfei in the United States in the Permanent Representatives of Boeing a year, he has done a lot of coordination and organization of contract negotiations, construction training package groups, as sub-contract manufacturing of civil aircraft and technical personnel to work independently of the process.
students have to study more when the President
2009 In March, the first Chinese military aviation industry and trade large orders – “Fierce Dragon” approved produce 42 aircraft to Pakistan signed the contract.
stipulated in the contract, final assembly of aircraft in Pakistan will start in June. Hao small place is an important appointment, to assume the chief representative of CAC in Pakistan and China team leader responsibilities, threw himself into the Chinese expert group set up and pre-construction preparations work.
“Fierce Dragon” foreign construction line is a complicated systematic project, is to fly into the plant’s first 50 years, even in the aircraft industry’s first precedent-setting move. In mid-June, Hao small release rate of the first group of experts arrived in Pakistan Kamra. “Little to say to each of us represents the CAC, to big, we represent the aircraft industry, representatives of China, our words and deeds, the project’s success is directly related to the aircraft industry and the state honor and image. “in the Group’s first plenary meeting, Hao seriously tell him to put a small team.
line early in the construction of more than three months time, are limited, various difficulties, both vertical linkages, but also horizontal coordination, to do too many things to deal with the problem too hard. In his organization and coordination, has completed production, quality, technology and management system; complete plant infrastructure, assembly, flight line, equipment installation, field preparations for a number of technical services; especially to overcome the language barrier, complete the training of Pakistani personnel.
6 months of Kamla, the average temperature of 50 ℃, not to mention work is nothing dry or sweaty. A day’s work, put the clothes are small Hao wet, dry, dry and wet. Many comrades joked that Kamla is a sauna, a good place to lose weight.
harsh environment and hard work of all of us for nothing, most headache experts is working with the Pakistani people to communicate due to language barriers result in the understanding of each other on technical specifications, absorption some difficulties, to learn and master the time is relatively slow, China will inevitably show some comrades impatient. “CAC decades of military aircraft engaged in manufacturing, compared with foreign advanced level, we are still students, and now, the students became President, we should cherish this opportunity even more patience to fine, in good faith to help each other improve military aircraft manufacturing level. “Hao small place organization and coordination, the establishment of joint production site will be the system through on-site meetings, day and time to solve problems.
expert in the construction line, placed a small Hao nickname “housekeeper.” Lack of spare parts in the construction line of work, he was responsible for contact with the company; expert comrades sick, he went to care; some of our comrades home has undergone difficulties, he took the initiative to contact the unit, to help solve. Spring Festival, the group unable to return the country, they write a couplet to do a bustling holiday.
open up the “Fierce Dragon” in Pakistan assembly flight line
in the “Fierce Dragon” line of Pakistan’s 17-month construction period, a small place and actively with the Pakistani Hao side on the progress of work, mode of cooperation, personnel management and review issues such as communication and coordination to start, and the establishment of the Chinese co-production management group, quickly opened the work situation.
2009 年 6 30, China and Pakistan team through close coordination and hard work, “Fierce Dragon” SP03 frame assembly in Pakistan successfully started, opened the “Fierce Dragon” aircraft built in a foreign country line made the big screen.
Hao small place in the organization and leadership, the Chinese expert group solidarity, fighting day and night, the SP04, 05,06 of the assembly have started work with Pakistan to teach the work synchronized.
2009 年 10 25, the first aircraft to complete the final assembly of Pakistan’s “Fierce Dragon” SP03 launched aircraft delivery assembly, flight test stations begin work; November 13, SP03 card holder in Pakistan Ratko MINHAS Air Force Base, successful maiden flight!
from the “Fierce Dragon” assembly in Pakistan after the start, put together with all the small Hao Chinese experts to carry forward the spirit of fearing neither hardship nor tired, with a strong determination to overcome the frequent power failures and other production site difficulties, overcome the earthquake and the terrorist panic attacks brought play to their wisdom, in the very limited working and living conditions, the successful realization of the “Fierce Dragon” co-production aircraft’s first flight of a major node, opened the final assembly of flight line in Pakistan for the subsequent development of the project has laid a solid foundation.
2009, the “Fierce Dragon” co-production batch was officially launched, marking the Chinese side has successfully completed test flights on Pakistan’s final assembly building and working with teaching staff, co-production project has entered a new stage .
in the past more than a year, Hao has been working to put a small spot in Pakistan, the organization and Chinese experts to carry out a solid advance the work, not only to help the Pakistani side to complete the technical state changes caused by the large number of process The site changes and a large number of documents of non-standard equipment, machine testing and commissioning, but also to guide Pakistan to gradually establish a production management, quality management, data management and workflow, and wholeheartedly to help Pakistan build its own aerospace industry, the practice of the Chinese aviation industry cooperation with foreign mission.
many years since, Hao small place in order to “Fierce Dragon” project continues to expand, the pursuit of excellence, never cared about personal gains and losses, their wisdom and unreserved dedication to the endless pursuit of his career on the air , in the “Fierce Dragon” aircraft technology transfer to third parties to make their own contributions.
No comment yet!